After the first phase of E-lottery, 01 shop of the remaining composite shop (Pisnari Tiraha Rajghat Road) will be operated under interim arrangement from 01.04.2026 to 09.04.2026.
After the first phase of E-lottery, 01 shop of the remaining composite shop (Pisnari Tiraha Rajghat Road) will be operated under interim arrangement from 01.04.2026 to 09.04.2026.